• elPortal_960x85_WebAd
  • AoF-Ad.-10.25-x-1Color
  • CP-Broadway-Bolero1
  • CP-Broadway-Bolero2
  • CP-Broadway-Bolero3
  • CP-Broadway-Bolero4
  • ROADMAP_728x90

Widgetized Section

Go to Admin » Appearance » Widgets » and move Gabfire Widget: Social into that MastheadOverlay zone

$18.6 million Gold Line Bridge Taking Shape

Photo by Terry Miller

$18.6 million Gold Line Bridge Taking Shape

At a cost of $18.6 million Gold Line bridge in Arcadia is deemed the “gateway to the San Gabriel Valley” has moved on to an important step in moving the project forward with the wood structure now showing across the 210.The bridge is the first project under construction along the 11.5 mile Gold Line Foothill Extension from Pasadena to Azusa. This image was shot Tuesday morning looking West on the 210 from Santa Anita. – Photo by Terry Miller

Share This Post

Google1Google
Posted by on March 21, 2012. Filed under Featured. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>